Instantaneous Flue Gas Recovery Systems IFGRS
Flue gas recovery systems (FGRS), or more accurately also known as flue gas heat recovery systems (FGHRS) capture and reuse waste heat from exhaust flue gases, these are used to preheat water or other fluids, improving energy efficiency by reducing demand and thus reducing emissions. Where this heat is used immediately on any used fluids it is known as an Instantaneous Flue Gas Recovery Systems (IFGRS). Where the heat captured is storage for later used it is known as a Storage Flue Gas Heat Recovery Systems SFGHRS. Whilst SFGHRS can provide both direct energy savings and deferred savings Instantaneous FGHRS (IFGHRS) provide predominantly direct savings (although there are still some indirect savings from the water and metal work comprising the system.
For further information see the UK government document "Review of the methodology for FGHRS in SAP".
[edit] Related articles on Designing Buildings
- Air conditioning.
- Back boiler.
- Biomass boiler.
- Boiler efficiency.
- Boiler.
- Carbon monoxide.
- CHP boiler.
- Coefficient of Performance CoP.
- Combustion appliance.
- Combination boiler.
- Condensing boiler.
- District energy.
- Domestic micro-generation.
- Exhaust air heat pump.
- Fluepipe.
- Geothermal pile foundations.
- Gross calorific value.
- Heat exchanger.
- Heat interface units.
- Heat pump.
- Heat recovery ventilation.
- Heat recovery for buildings.
- Heat source.
- Hot water.
- Heating.
- HVAC.
- Mechanical ventilation.
- Mechanical ventilation's role in improving indoor air quality.
- Refrigerants.
- Tempering heating.
- Types of boiler.
- Types of heating system.
- Types of heat exchanger.
- Variable refrigerant flow.
- Waste heat.
- Waste water.
- Zero Bills Home.
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.

















